Wednesday, December 31, 2008

December 31, 2008

Last day of 2008 and we are working on 3 murphy beds. Two are part of the "Quick Ship Plan" and the last one is for Hensley. Hensley's will be an Alpine in oak finished with black lacquer.

You can watch us built this project live from our Current Projects page at wwbeds and poggyskids.com Also at the site photographs are posted each day of our work.

To see when your project will be built, check out our Customer Status link.

Monday, December 29, 2008

December 29, 2008


Today we will be getting Hunt's desk prepped for the finish shop. We will also be building a couple Alpine murphy bed for our new "Quick Ship Plan".
You can watch us built this live from our Current Projects page at wwbeds and poggyskids.com Also at the site photographs are posted each day of our work.

To see when your project will be built, check out our Customer Status link.

Saturday, December 27, 2008

December 27, 2008

Today we will be working on getting Hunt's bed ready for the finish shop. We will also be finishing out some tool boxes and starting a murphy bed.

You can watch us built this live from our Current Projects page at wwbeds and poggyskids.com Also at the site photographs are posted each day of our work.

To see when your project will be built, check out our Customer Status link.

Monday, December 22, 2008

December 22, 2008

Christmas is getting closer. We are very busy in the shop. I will be working on the finish for a desk, the finish on a couple bookcases, Building the tops and drawers for a chest, building a baseball loft bed, and getting a murphy bed shipped out.

Friday, December 19, 2008

December 19, 2008

We will be working on the side bookcases for Hunts desk. I built the center section yesterday, well just framed it out. There is still work to be done on the center. Also we should be working a little on a baseball loft bed and getting Rosenburg's beds ready to ship.

You can watch us built this live from our Current Projects page at wwbeds and poggyskids.com Also at the site photographs are posted each day of our work.

To see when your project will be built, check out our Customer Status link.

Thursday, December 18, 2008

December 18, 2008

We have Rosenberg's beds finished and they are being assembed and checked. I have also started on Hunts wall/desk. I should make good progress on the center section of the desk.

You can watch us built this live from our Current Projects page at wwbeds and poggyskids.com Also at the site photographs are posted each day of our work. I've been a little slow on getting up-to-date pictures.

To see when your project will be built, check out our Customer Status link.

Monday, December 15, 2008

December 15, 2008

Today I will be working on Rosenberg's queen Euro murphy bed in walnut. We have their other twin one in "final assembly". I'll also be doing some design work on a desk for the same customer I built the Hudson bay for.

You can watch "Santa's Workshop" live from our Current Projects page at wwbeds and poggyskids.com Also at the site there are photographs posted each day of our work. To see when your project will be built, check out our Customer Status link.

Friday, December 12, 2008

Santa's out

Here is a video of us working in the shop.

Try JibJab Sendables® eCards today!

Thursday, December 11, 2008

December 11, 2008

14 days til Christmas and things are going to get very busy around "Santa's Workshop". We will work on Rosenberg's last bookcase for their twin murphy bed. We will also cut the parts for Robert's Alpine.

You can watch us built this live from our Current Projects page at wwbeds and poggyskids.com Also at the site photographs are posted each day of our work.

To see when your project will be built, check out our Customer Status link.

Wednesday, December 10, 2008

December 10, 2008

Today Santa's little elves will be finishing up the building phase for Rosenberg. After we build the bed we'll build the two bookcases. One will be regular and the other will have an angled back to accomidate a curved back corner. We may even be able to get some white finish on it.

You can watch us built this live from our Current Projects page at wwbeds and poggyskids.com Also at the site photographs are posted each day of our work.

To see when your project will be built, check out our Customer Status link.

Tuesday, December 9, 2008

December 09, 2008

Santa has decided to use wwbeds.com and poggyskids.com as the official “Santa Workshop". Today we'll be putting the final touches on Hunts murphy bed. We'll also be building the twin Euro for Rosenberg.

You can watch us built this live from our Current Projects page at wwbeds and poggyskids.com Also at the site photographs are posted each day of our work.

To see when your project will be built, check out our Customer Status link.

Monday, December 8, 2008

December 8, 2008

Just finished up Hunt's murphy bed and will start on their custom desk. I'll also start building Rosenberg's twin size murphy bed and bookcases.

You can watch us built this live from our Current Projects page at wwbeds and poggyskids.com Also at the site photographs are posted each day of our work.


To see when your project will be built, check out our Customer Status link.

Thursday, December 4, 2008

December 4, 2008

Today we'll be working on Hunt's murphy bed. We just send out a bed for another Hunt. It was actually a Hudson Bay also except that one was a sideways version.

Did you get a chance to see Santa's workshop? Santa has chosen us to build for him. Read more...

Here is the video if you missed it.
Webcam chat at Ustream

You can watch us built this live from our Current Projects page at wwbeds and poggyskids.com Also at the site photographs are posted each day of our work.


To see when your project will be built, check out our Customer Status link.

Friday, November 28, 2008

November 28, 2008

Santa has decided to use wwbeds.com and poggyskids.com as the official “Santa Workshop". You will not see elves but some really weird people. You’ll see us working on Hunt’s Hudson Bay. I actually have to customers named Hunt, both with a Hudson Bay. One full size the other queen and they are both due the same time. Fernandez will also have their bed built today.

You can watch us built this live from our Current Projects page at wwbeds and poggyskids.com Also at the site photographs are posted each day of our work.

To see when your project will be built, check out our Customer Status link.

Tuesday, November 25, 2008

November 25, 2008

Today we'll be working on Newth's boat bed getting it ready to stain. I should also have most of Albers' murphy bed just about ready to stain also.

You can watch us built this live from our Current Projects page at wwbeds and poggyskids.com Also at the site photographs are posted each day of our work.

To see when your project will be built, check out our Customer Status link.

"My German Friend" should pick up thier bed today. Here is a quick picture.

Monday, November 24, 2008

November 24, 2008

I'll be putting the finishing touches on the Euro bed. I should also have the boat bed ready for the finish shop.

Friday, November 21, 2008

November 21, 2001

Today we will be spraying the large "My German Friend" job. We will also be working on the boat bed and Albers' doors for their murphy bed.

You can watch us built this live from our Current Projects page at wwbeds and poggyskids.com Also at the site photographs are posted each day of our work.

To see when your project will be built, check out our Customer Status link.



Thursday, November 20, 2008

November 20, 2008

The murphy bed we've been working on is just about ready for the stain. I will also be working on a boat bed for Newth. The boat will be an all maple style. We also have some parts for Hunt and Alber's murphy beds.

You can watch us built this live from our Current Projects page at wwbeds and poggyskids.com Also at the site photographs are posted each day of our work.

To see when your project will be built, check out our Customer Status link.

Wednesday, November 19, 2008

November 19, 2008

Working on the doors and shelves for "My German Friend". Paul and Donald will be working on mass producing the inside frame for murphy beds for stock.

You can watch us built this live from our Current Projects page at wwbeds and poggyskids.com Also at the site photographs are posted each day of our work.

To see when your project will be built, check out our Customer Status link.

Tuesday, November 18, 2008

November 18, 2008

Still working on the Euro set for "My German Friend". We will also be building a large Christmas stand for a local designer.

You can watch us built this live from our Current Projects page at wwbeds and poggyskids.com Also at the site photographs are posted each day of our work.


To see when your project will be built, check out our Customer Status link.

Monday, November 17, 2008

November 17, 2008

Working on the benchs to go along with the Euro bed, 2 bookcases, and a corner unit.

You can watch us built this live from our Current Projects page at wwbeds and poggyskids.com Also at the site photographs are posted each day of our work.

To see when your project will be built, check out our Customer Status link.

Saturday, November 15, 2008

November 15, 2008

Finished up framing the corner bookcase and now we will build the window seats and doors for "My German Friend".

You can watch us built this live from our Current Projects page at wwbeds and poggyskids.com Also at the site photographs are posted each day of our work.

To see when your project will be built, check out our Customer Status link.

Friday, November 14, 2008

November 14, 2008

Working on a corner unit to match the Euro murphy bed.

You can watch us built this live from our "Current Projects" page at www.wwbeds.com and www.poggyskids.com. Also at the site photographs are posted each day of our work.

To see when your project will be built, check out our Customer Status link.

Just finished up a Baseketball Locker bed.

Thursday, November 13, 2008

November 13, 2008

I'll be working on the bookcases for the Euro murphy bed. The other guys may be working on a twin size murphy bed for Webb.

You can watch us built this live from our "Current Projects" page at http://www.wwbeds.com/ and http://www.poggyskids.com/. Also at the site photographs are posted each day of our work.

To see when your project will be built, check out our Customer Status link.


Wednesday, November 12, 2008

November 12, 2008

I'll be working on "My German's friend's" set today. McKyla's platform was sprayed yesterday and should be assembled later today.

Monday, November 10, 2008

November 10, 2008

Start of a new week and I'll be working on Martin's platform bed and "My German Friend's" bookcases.

Off camera we will be boxing Doss and getting Lancaster's and Sepulvado's murphy bed ready.

Friday, November 7, 2008

November 7,2008

Building Sepulvado's murphy bed today. I should also build "My German Friend's" Murphy bed.

I had a little delay yesterday with an web site crash. Things should be back to normal. If you see any problems please report them to chris@wwbeds.com

Thursday, November 6, 2008

November 6, 2008

Finished building Lancaster's locker murphy bed and will send it to the finish shop. I'll finish up on the building of Sepulvado's murphy bed today. I should also cut some of the part for "My German Friend".

Wednesday, November 5, 2008

November 5, 2008

Today I'll be starting on a few different projects and trying to get them rolling. I'll be working on Lancaster, Sepulvado, and Heiskell. All of these are murphy beds.

Wednesday, October 29, 2008

October 29, 2008

Finished up with Barnett and Patrick and will be boxing thier murphy beds. I'll will be working on Blum's murphy bed and custom bookcase. The bookcase will have a fold down desk.

Here are some drawings:
http://wwbeds.com/april08pictures/scan0001.jpg http://wwbeds.com/april08pictures/scan0002.jpg

Tuesday, October 28, 2008

October 28, 2008

Start out the morning preping and spraying Barnett's bed. We'll then move onto Patrick's bed ready. After that we'll final assemble Barnett's

Saturday, October 25, 2008

October 25, 2008

I have Perser completed and I am going to work on Barnetts bed. I would like to have it stained today if possible. Saturdays are real busy in our Showroom and not a lot gets done in the shop.

Some of the pictures that are linked are form the Current Projects page at wwbeds.com.

Friday, October 24, 2008

October 24, 2008

We will be preping Perser's bed and casegoods for finish and should finish it out after lunch. While it is in the finish shop. I will start on Barnett's Manchester Murphy wall bed.

Make sure you watch live at our Current Projects page.

Thursday, October 23, 2008

October 23, 2008

I will be working on Perser's captain's bed. Yesterday I framed out the chest, nightstand, and drawer unit. Today I will be working on the headbaord and footboard. I have the casegood tops and drawer fronts cut out and will have Paul and Donald sand and router them.

We also are finishing up the baseball bed for Compass Homes and Fantasia


Make sure you watch live at our Current Projects page.

Wednesday, October 22, 2008

October 22, 2008

I will be building on two projects today, Martin's vanity and Perser's Captain's bed. I'll be working on both of these at the same time and having Donald and Paul work on some of the parts for me.

More of our work and live video can be see on our Current Projects link from our web site http://www.wwbeds.com/ .

Tuesday, October 21, 2008

October 21, 2008

The finish shop will be busy today. We will be finishing Cothern, Burgener, Fantasia, and Compass Homes.

We are also shipping out Rafferty and Warner.

More of our work and live video can be see on our Current Projects link from our web site http://www.wwbeds.com/ .

Monday, October 20, 2008

October 20, 2008

We have a lot of beds that are going out or just went out. Off camera there should be some boxing going on. In the shop I'll be working on another round of custom furniture.

Cothern's oak drawer pedestal and platform.
Burgener's drawer pedestal with door kit
Martin's Vanity.

Make sure you watch live at our current projects page.

Thursday, October 16, 2008

October 16, 2008

There are a lot of things going on in the next week. Here is a break-down of what we're working on.

Warner's Murphy bed is ready to bed assembled and checked before going out.
Rusk's Murphy is being finial assembled.
Friedman's boat and baseball bed is ready to assembled.
Mertz's Muprhy bed is ready to finish.
Weatherly's Murphy bed should be ready to finish by the end of the day.

More of our work and live video can be see on our Current Projects link from our web site http://www.wwbeds.com/ .

Wednesday, October 15, 2008

October 15, 2008

I will be working on Warner's Murphy bed. Paul and Donald will be finishing Friedman's boat and baseball beds. They will also be finishing Rusk and hopefully get to Mertz and finish it.

More of our work and live video can be see on our Current Projects link from our web site http://www.wwbeds.com/ .

Tuesday, October 14, 2008

October 14, 2008

Friedman's boat and baseball beds will be getting their finish sprayed on. Mertz's Murphy bed should be finished buiding and preping for finish tomorrow.

More of our work and live video can be see on our Current Projects link from our web site http://www.wwbeds.com/ .

Also don't forget to check out another blog site. Lumberjocks.com

Click for details: Custom Castle Loft

Monday, October 13, 2008

October 13, 2008

Saturday I cut out some of the parts to Mertz Ross Murphy bed. Today I will be processing some of those pieces.

More of our work and live video can be see on our Current Projects link from our web site http://www.wwbeds.com/ .

Wednesday, October 8, 2008

October 8, 2008

Moorman's locker bed and case goods are being finished. Friedman's baseball and boat beds are going to be worked on. Rafferty's murphy bed is being assembled after the finish was applied.

More of our work and live video can be see on our Current Projects link from our web site http://www.wwbeds.com/ .

Monday, October 6, 2008

October 6, 2008

On our live shop cam you should see us working on Moorman's Locker bed and casegoods. I will also dye Rafferty's murphy bed to prep if for stain tomorrow. If there is time I will build Friedman's boat and baseball beds.

Friday, October 3, 2008

October 3, 2008

On camera you should see Rusk's Smithsonian murphy bed being built. It should be ready for the finish shop on Tuesday.

Waldo's Lakeside was sprayed and is being assembeled. It should be ready later today.

More of our work and live video can be see on our Current Projects link from our web site http://www.wwbeds.com/ .

Wednesday, October 1, 2008

October 01, 2008

Waldo's murphy bed should be in the finish shop. Mcdermont's is being finial assembled. I will be building Rusk's Smithsonian murphy bed.

Don't forget more of our work and live video can be see on our Current Projects link from our web site http://www.wwbeds.com/ .

Monday, September 29, 2008

September 29,2008

I will work on Rusk's Smithsonian and Waldo's Lakeside murphy beds. Remember custom furniture pictures and live video can be seen from our web site http://www.wwbeds.com/ .

Friday, September 26, 2008

September 26, 2008

I am working on Rafferty's mission style. We should get it stained out today. If time allows, I will start on Rusk's Smithsonian murphy bed. Remember custom furniture pictures and live video can be seen from our web site www.wwbeds.com .

Thursday, September 25, 2008

September 25, 2008

On camera you should see Rafferty's Mission murphy bed being assembled.

Off camera we will be doing the final assembly of Reshaur's Euro murphy. Also being wrapped up is the chalkboard murphy bed.

The Yankee's Murphy bed is now having the graphic work done on it.

Monday, September 22, 2008

September 22, 2008

I will be prepping both Crowell and McDermont's muphy beds for the finish shop. One will be a baseball locker style and the other will be a chalkboard style

Friday, September 19, 2008

September 19, 2008

Today we will be working on Crowell's Murphy bed. This one will have a chalkboard face. I have the parts cut out for McDermont so I may work on that a little too. McDermont is our baseball locker style.

See more of what we are working on at www.wwbeds.com and on our "Current Projects" link where we have live streaming video of our shop.

Wednesday, September 17, 2008

September 17, 2008

We are building the last parts for RSC (desks and file cabinest). We will stain and put the finish coats on today.

Monday, September 15, 2008

September 15, 2008

Finishing up the building phase for RSC's 2 desk, a receptions desk, and a file/armoire. I will also be getting the murphy bed for Steiner ready for the finish shop.

Don't forget to check out the current projects link at: http://www.wwbeds.com/Current%20Projects.htm

This information provided for www.wwbeds.com and www.poggyskids.com

Saturday, September 13, 2008

September 13, 2008

Today I will be be building a table base for Chandlers. I will also be finishing up the desk for RSC.

Friday, September 12, 2008

September 12, 2008

We should apply the finish on Williams' platform bed. We are also working on the desk tops for RSC's phase 3 and4.

Thursday, September 11, 2008

September 11, 2008

We will be finishing the building phase for Steiner's murphy bed. We will also wrap up Williams' platform bed and finish it in a cappicino finish. I will try to get most of the building completed on RSC's phase 3 and 4.

Wednesday, September 10, 2008

September 10, 2008

Working on Steiner's queen Bullock murphy bed. We will also be building a platform for Williams.

Monday, September 8, 2008

September 8, 2008

I will be working on Steiner's Murphy bed and bookcase. This is a Bullock style with a desk that pulls out of the bookcase. If I get the drawings, I will start on Williams' platform bed.

Friday, September 5, 2008

September 5, 2008

First thing this morning I will be finishing some crown and base molding to be shipped out. I will also spray the post for a baseball headboard and adjust the color for a muphy bed.

Off camera final assembly and boxing of Manos' bed will take place. If there is time we will also box Hall's castle.

Thursday, September 4, 2008

September 4, 2008

Finish up Hall's castle loft and work on Alewine's baseball bed. Final assemble will continue on Rando's loft bed.

Wednesday, September 3, 2008

September 3, 2008

Happy Birthday Elizabeth! It is my daughters 4th birthday. Now back to work. Still working on Hall's castle loft and Alewine's baseball headboard. I have the castle parts cut out and the tower built.

Tuesday, September 2, 2008

September 2, 2008

Back from Labor Day and ready to get moving on Hall's castle loft and Alewine's baseball headboard.

We will also have a new finishing system installed today.

Friday, August 29, 2008

August 29, 2008

We have the primer on Rando's loft bed and we should get the black lacquer on today. If we can get that out of the way we'll start on the castle loft.

Thursday, August 28, 2008

August 28, 2008

We will be finishing up Chandler's table base and spraying the loft for Rando. I should start cutting the parts for Hall's castle loft bed later today.

Wednesday, August 27, 2008

August 27, 2008

Today we will be putting the Waterfall Babinga on the walnut table base. We should have Rando's loft bed ready to spay. If time we should spray Sharrod's bookcases.

Tuesday, August 26, 2008

August 26, 2008

Happy birthday to me! Today is my birthday and I'll be working on Rando's Loft bed. I am jsut about finished with Chandlers table base.

Monday, August 25, 2008

August 25, 2008

Just in from IWF in Atlanta. Now back to work! I will be working on Rando's Loft bed and Chandlers table base (watch this one it will be awsome). I also have some bookcases to build for Sharrod.

Did you happen to see who I met at the IWF (International Woodworking Fair). Check it out: http://wwbeds.com/aug08pictures/HPIM8695.JPG
Norm Abram from the New Yankee Workshop.

Wednesday, August 20, 2008

August 20, 2008

Leaving for IWF (International Woodworking Fair) after lunch. I have a line up of things to do while I am gone. I have a few murphy beds and some baseball stuff that can be finished out. Off camera today we should be boxing up 3 baseball beds and getting them ready to ship.

In the few hours before I leave I will try to get a replacement hutch for Votta and a baseball bed for LeQuin ready to finish.

Tuesday, August 19, 2008

August 19, 2008

One more day until IWF (International Woodworking Fair). Trying to finish up a few things before I go. Robinson's murphy bed is ready to finish and I should have Pridgeon's bed ready to finish by the end of the day. If I don't start on McDonald today, I will work a few hours tomorrow before the IWF trip.

Don't worry. The shop will be in full production mode while I'm out. I can even peek in on them, if they keep the camera's on.

Monday, August 18, 2008

August 18, 2008

The IWF (International Woodworking Fair) is almost here and things will be moving fast in the next few days. I plan on getting the murphy beds for Robinson and Pridgeon ready to go the finish shop and start on Manos' bed.

Out of camera view we should be getting the baseball beds ready for: Eleiott, Sagarino, and LeQuin. We should also be final assembling the baseball loft for Brinegar.

Tuesday: finish up Manos and help with the finish on Robinson.

Wednesday: build McDonald's baseball bed.

Saturday, August 16, 2008

August 16, 2008

Saturday's are a busy day in our showroom. If you see activity in the shop, I'll be getting Robinson's murphy bed ready for the finish shop and starting on Pridgeon's murphy bed.

Friday, August 15, 2008

August 15, 2008

Will be building Robinson's murphy bed and bookcases. Off camera we will be assembling and getting ready to ship a few baseball beds and a Hickory murphy bed.

Thursday, August 14, 2008

August 14, 2008

We are still spraying the last baseball parts for Bringar, Pendleton, Eleiott, Saggrino, and McDonald. I have the doors and sides built for Steffler and the doors for Robinson. I should finish up Steffler's Murphy bed today.

Wednesday, August 13, 2008

August 13, 2008

We will be spraying the last baseball parts for Bringar, Pendleton, Eleiott, Saggrino, and McDonald. We will also be building the murphy beds for Steffler and Robinson.

Tuesday, August 12, 2008

August 12, 2008

We will be final assembling Cunninghams bed and working on baseball beds and lofts for the rest of the day.

Monday, August 11, 2008

August 11, 2008

We will be spraying Cunningham's bed today. This is a multi-step process involving dye stain, a wiping stain, and two coats of lacquer. After the spraying is complete I'll be building the slide for Brinegar's baseball loft.

We will also be boxing up Koster's King size bullock off camera.

To see updated picture of what we are working on and a live video feed of our shop go to our "Current Projects" page.

Saturday, August 9, 2008

August 9, 2008

Off camera I'll be putting the final touches on Koster's king murphy bed. On the baseball loft, I should get it ready to finish out. Saturday is a busy time for our showroom, so you may see just sporadic activity.

Friday, August 8, 2008

August 8, 2008

Working on the finish for Koster's king murphy bed. I will also be building the baseball loft bed.

Thursday, August 7, 2008

August 7, 2008

We will be finishing the spraying of the headboards for Pendleton, Eleiott, McDonald, and Sagarino's baseball beds. I will also be finishing up the baseball loft bed and getting it ready to spray.

Wednesday, August 6, 2008

August 6, 2008

I will be working on Koster's kings size murphy bed and later in the day work on Brineger's baseball loft. The others in the shop will be working on baseball beds for Pendleton, Eleiott, McDonald, and Sagarino.

Tuesday, August 5, 2008

August 5, 2008

We should be spraying the desk for Votta and the baseball headboards only for Pendleton, Elieott, McDonald, LeQuin. I will also finish up the building for Koster.

This list is to provide customers of wwbeds.com, and poggyskids.com with information on the building of their custom furniture. A live view can be seen on our "Current Projects" page.

Monday, August 4, 2008

August 4, 2008

We will be working on a baseball desk for Votta. We may also get to building a king size Bullock murphy bed.

Saturday, August 2, 2008

August 2, 2008

It's Saturday and busy in our showroom. If we're in the shop we will be working on a baseball desk for Votta.

Friday, August 1, 2008

August 1, 2008

We will be working on the face to Cunningham's mission murphy bed. We will also be building a baseball desk.

Thursday, July 31, 2008

July 31, 2008

Assembling Cunninghams bookcases and then later in the day finishing up the bed.

Wednesday, July 30, 2008

July 30, 2008

Cut the parts out for Cunningham's murphy bed and going to finish assembling it.

Monday, July 28, 2008

July 28, 2008

Will be building Cunningham's murphy bed and may start on Votta's desk.

Tuesday, July 22, 2008

July 22, 2008

Putting together Justin/Liz's Murphy bed . Spraying Bryant's Alpine bed. Working on Schools bookcases

Monday, July 21, 2008

July 21, 2008

Today we should be spraying shelves for a local school. We should also be spraying a white lacquer on a Templeton murphy bed. Any free time will be spent working on the bookcases for the school.

Friday, July 18, 2008

July 18, 2008

Today I will be preping 3 murphy beds for the finish shop (Votta, Liz, and Bryant). I will also build a twin bookcase headboard in pine for Bryan. I will get the drawer unit for Okeefer started and cut and band the pieces for The Montessori School's 20 bookcases. Busy day.

Thursday, July 17, 2008

July 17, 2008

I will finish building Votta's Locker Murphy bed and continue on Liz's Templeton with beadboard. I will start on Bryant's Alpine Murphy bed. I have a bookcase headboard in there somewhere for Bryan.

Wednesday, July 16, 2008

July 16, 2008

I will start on Votta and Liz's Murphy beds. I will also try to start on Little Rock Montessori's bookcases.

Tuesday, July 15, 2008

July 15, 2008

We will be putting the final touches on Rains' platform bed and case goods (probably off camera). Defelice's Murphy bed will be finished building and hopefully the finish applied.

Monday, July 14, 2008

July 14, 2008

Finish building Defelice's murphy bed and I will be building Rains' platform bed.

Saturday, July 12, 2008

July 12, 2008

I should be working on Rains' case goods and starting on thier platform bed. The finishing process is still going on for Cunningham's bed.

Friday, July 11, 2008

07-11-2008

Finish building DeFelice's Murphy bed and put the finish on Cunningham's. I may also start building Rains platform bed and casegoods.

Thursday, July 10, 2008

July 10, 2008

We will be finishing the building of Cunningham Murphy bed and bookcases and start on DeFelice's. I hope also to start on building Rains' platform style bed with some casegoods.

Wednesday, July 9, 2008

07-09-2008

We will final assembly Carlson's Murphy bed, staining Faulkner's murphy bed and building Cunningham.

Tuesday, July 8, 2008

July 8, 2008

In the morning we will deliver and install a murphy bed for a local customer. It will be pulled up the second story by ropes. After that we should get Carlson's murphy bed ready to finish and then start on Falkner's Murphy bed.

Monday, July 7, 2008

July 67 2008

I will be working on Carlson's Oak Mission style murphy bed and should start on Cunninghams Mission style. We will also be final assembling Harned and Johnson's furniture.

Saturday, July 5, 2008

July 5, 2008

We will be working on Carlson's murphy bed and finishing up Johnson's desk, dresser, chest, and table. Hope everyone had a great 4th.

Thursday, July 3, 2008

July 03,2008

We will be finishing up the building part of Johnson's desk, dresser,chest and table. I will also be building another prototype of a bookcase for a local school.

Wednesday, July 2, 2008

July 2, 2008

I will build a prototype of a bookcase for a local school. I will also work on Johnson's pine items.

Tuesday, July 1, 2008

July 1, 2008

Final assembly and delivery on RSC's items. I will also work on Johhson's pine items and a prototype bookcase for a local school.

Monday, June 30, 2008

June 30, 2008

Will be putting the finishing touches on RSC's desk, armoire, bookcase, and beds. Finished up their Murphy bed. It is a new design with a fold out desk. Here is a picture with the desk open and closed.

Saturday, June 28, 2008

June 28, 2008

We will be working out the details on RSC's murphy bed with the fold out desk. We will also try to stain their conference table top.

Friday, June 27, 2008

June 27, 2008

Working on the Armoire and Murphy bed for RSC. We will also be putting the final touches on the two desk and Harneds murphy bed.

Thursday, June 26, 2008

June 26, 2008

What! Green hair? If you see someone with green hair in the shop today that is me, Chris. It was a challenge for Vacation Bible School. Even with green hair I am still working. We will be completing the desk for RSC and building the armoire and murphy bed for them also.

By the way Happy Anniversary to my wife. We've been married 9 years.

Wednesday, June 25, 2008

June 25, 2008

Built the desk for RSC and started the Armoire. Today we will continue on the Armoire and work some more on the Murphy bed.

Tuesday, June 24, 2008

June 24, 2008

Still working on RSC's items. Worked on Erwin's TV stand and Chest yesterday, plan on staining it today.

Monday, June 23, 2008

June 23, 2008

Today I will be working on RSC's two desks, armoire, and Murphy bed.

Saturday, June 21, 2008

June 21, 2008

Saturday is a busy time in the showroom, so we might not get much done in the shop. I do plan on working on RSC's phase 2 stuff and completing a couple baseball beds for shipping.

Friday, June 20, 2008

June 20, 2008

We will be getting Klotz's murphy bed together and final assembling the two baseball beds. We will also start building RSC's phase 2.

Thursday, June 19, 2008

June 19, 2008

We will be putting a cherry finish on Klotz's murphy bed. We will also be getting the two pre-cut Murphy beds for Carman and Roberts ready to ship.

Wednesday, June 18, 2008

June 18, 2008

Shiffler and Peterson's baseball beds will be going to get the graphic work done to them. We'll also be building Carman and Roberts Murphy beds.

Tuesday, June 17, 2008

June 17, 2008

We will be working on Shiffler and Peterson's Baseball beds. The customer is also picking up the 3 loft beds so we will be getting those together.

Monday, June 16, 2008

June 16, 2008

We'll be starting on Peterson's baseball bed after we deliver RSC's desk and file cabinets to them.

Friday, June 13, 2008

June 13, 2008

We will be wrapping up the building for RSC and start with some of the finish work. This is a large project consisting of 3 desk, reception's counter, conference table, and 3 lateral file units. This is only phase 1. Comming up in a couple weeks for RSC is a murphy bed, an armoire, and a couple more corner desk.

Thursday, June 12, 2008

June 12, 2008

Working on all of RSG's desk and files, concentrating on a reception's desk. We will also be finishing up the trundles and ladders for Dalby's loft bed.

Wednesday, June 11, 2008

June 11, 2008

We will be working on some more of RSG's items and assembling Dalby's loft.

Tuesday, June 10, 2008

June 10, 2008

We will be spraying the other half of dalby's lofts. We will also be building the tops for some of RSG's desks

Monday, June 9, 2008

June 9, 2008

Today we will continue working on some custom desk and file cabinets for RSG. These will built form maple wood. I will most likely be building the corner desk for them most of the day.

Saturday, June 7, 2008

June 7, 2008

Saturday is a busy day in our showroom. I will try to work on some of RSC's file cabinets in between helping customers.

Friday, June 6, 2008

June 06, 2008

Dalby's 3 loft beds will be prepped for finish and will start working on some file cabinets for RSG.

Thursday, June 5, 2008

June 5, 2008

Finished up building Klotz Murphy bed and it is ready for the finish. I will building the second phase to Dalby's loft bed. We had the first phase sparyed yesterday.

Wednesday, June 4, 2008

June 4, 2008

Today I will still be working on Klotz Bullock Murphy bed and bookcases. Parts to Dalby's loft beds will get their second coat of finish.

Tuesday, June 3, 2008

June 03, 2008

Today I will still be working on Klotz Bullock Murphy bed and bookcases. Parts to Dalby's loft beds will be sprayed today also.

Monday, June 2, 2008

June 1, 2008

Today I will be working on Klotz Bullock Murphy bed and bookcases. I will also be trying to get parts to Dalby's loft beds prepped for finish (only half the parts). There are so many pieces I have to break it up into two phases.

Saturday, May 31, 2008

May 31, 2008

Today we will be putting together that Bullock murphy bed that was sprayed yesterday. We will be also working on another Bullock. It is Saturday so usually things are a little slow in the shop.

Thursday, May 29, 2008

May 30, 2008

We will be assembling the Excalibur Murphy bed and the two baseball beds. We will also continue building on the All-in-one lofts.

May 29, 2008

Finishing up baseball beds for Sachdev and bell. I will be building a murphy bed for Klotz and 3 All-in-one bunk beds for Dalby.

Wednesday, May 28, 2008

May 28, 2008

Today I will be wraping up the finish on an Excalibur Murphy bed. I'll also be working on a couple different baseball beds for Sachdev and Bell.

Saturday, May 24, 2008

May 24, 2008

We will be building two baseball beds. One Special Edition (Sachdev) and one regular (Bell)with a drawer pedestal. I will also final assembling the Murphy bed for Perez.

Friday, May 23, 2008

May 23, 2008

Still building Perez's Murphy bed. Actually I am almost ready to spray the bed, but working on his desk. I will also start another Murphy bed. Here are some links to what we did on Thursday:




Thursday, May 22, 2008

May 22, 2008

Building
I will continue to work on Perez's murphy bed and desk. I will also finish up on Carolan's waterbed.


Just wrapped up
We just finished up Wilson's Bullock bed. I'll post some finished pictures soon.
For more pictures and live video feed of our shop go to our "Current Projects" page. http://www.wwbeds.com/Current%20Projects.htm


Wednesday, May 21, 2008

May 21, 2008


Building
I will be starting on Carolan's king size waterbed with 6 drawer pedestal. I will also start in Perez's full size Alpine murphy bed with custom desk.

Just wrapped up
Just finished up See's Euro murphy bed. It will be delivered tomorrow.

Final Assembly
Sprayed Wilson's Bullock yesterday ad will assemble it today.

Tuesday, May 20, 2008

May 20, 2008

We will be spraying two murphy beds. We have a Bullock in oak and a Euro in maple. Both of these will be completed by tomorrow.

Monday, May 19, 2008

May 19, 2008 PM


Have the Euro Murphy bed ready to shoot the finish on it. I am now starting on an oak Bullock Murphy bed.

May 19, 2008


Today I should be working on a Euro Murphy bed for Wendy. I will get this ready for the finish to be sprayed tomorrow. I will also start on Wilson's Bullock Murpy bed.

Live shop Cam

This is the first blog. I plan on keeping my customers informed on what I am doing daily on this blog. They can sucribe to get email alerts daily.